Appropriate Assessment Screening and Natura Impact Statement
Environmental Impact Assessment Report
- 1.6MB EIAR Volume 2 Part B Table of Contents
- 115.0KB 1A Specialists qualifications
- 3.3MB 2A Ringsend WwTP Scoping Report for EIS and NIS
- 5.9MB 2B RBSF Scoping Report for EIAR and NIS
- 10.9MB 2C Ringsend WwTP - Report on Public Consultation
- 2.8MB 2D RBSF - Stage 3 Consultation Report
- 208.8KB 3A Details of Proposed Facilities for the WwTP
- 2.2MB 4A Long Sea Outfall Design Considerations
- 4.3MB 4B Worldwide Nereda Variants and Applications
- 786.8KB 4C AGS Process Proving Summary Report
- 1.3MB 4D RBSF Stage 1 Report - Site Selection Methodology
- 4.9MB 4E RBSF Stage 2 Report - Identification of Potential Sites
- 7.3MB 4F RBSF Stage 3 Report -Identification of Preferred Site
- 1.6MBEIAR Volume 3 Part B Table of Contents
- 32.5MB4A Water Quality Modelling
- 712.5KB4B DCPM Modelling - Tolka Estuary
- 1.3MB5A Biodiversity Marine Species Inventory
- 607.2KB6A Outline Invasive Species Management Plan
- 278.4KB7A Waste Management Plan Ringsend WwTP
- 134.2KB8A Air Quality Standards
- 185.7KB8B Dust Minismisation Management Plan
- 116.8KB9A Acoustic Glossary
- 150.0KB9B Noise Model Details
- 207.6KB9C Noise and Vibration Management
- 194.4KB11A Record of Monuments
- 5.9MB14A Photomontages
- 1.0MB17A Outline CEMP
- 1.6MBEIAR Volume 4 Part B Table of Contents
- 114.7KB3A RBSF Receptors List
- 120.3KB6A Criteria for Ecological Evaluation
- 313.2KB7A Waste Management Plan RBSF
- 133.7KB8A Air Quality Standards
- 127.7KB8B Dust Minismisation Management Plan
- 201.8KB9A Acoustic Glossary
- 155.3KB9B Noise & Vibration Management
- 1.8MB10A Odour contours
- 120.3KB11A Record of Monuments
- 105.9KB11B Sites and Monuments Record
- 139.9KB11C Archaeological Investigations
- 4.1MB14A Photomontages
- 35.4MB14B Glint and Glare Assessment
- 1.0MB17A Outline CEMP
- 3.0MB EIAR Volume 5 Part A Table of Contents
- 27.0MB Y15710-PL-900-General Site Location Plan
- 730.3KB Y15710-PL-901-Site Layout showing Red Line Boundary with Compounds
- 1.3MB Y15710-PL-902-Dublin Bay Conservation Designations - Special Area of Conservation (SAC)
- 1.3MB Y15710-PL-903-Dublin Bay Conservation Designations - Special Protection Area (SPA)
- 1.1MB Y15710-PL-904-Dublin Bay Conservation Designations - Proposed Natural Heritage Areas (PNHA)
- 983.7KB Y15710-PL-905-Dublin Bay Bathing and Recreational Areas
- 1.1MB Y15710-PL-906-Dublin Bay Water Framework Directive Categorisations
- 1.1MB Y15710-PL-907-Conservation Designations UNESCO Biosphere
- 1.4MB Y15710-PL-908-Conservation Designations National Monuments & Zones of Archaeological Potential
- 1.7MB Y15710-PL-910-Existing WwTP Site Layout
- 769.0KB Y15710-PL-911-Existing Utilities Networks
- 1.1MB Y15710-PL-912-Existing Background Information of Buried Cross Site Pipework
- 829.7KB Y15710-PL-913-Development 'As Consented' in 2012 (29N.YA0010) - Sheet 1 of 2
- 843.9KB Y15710-PL-914-Development 'As Consented' in 2012 (29N.YA0010) - Sheet 2 of 2
- 893.3KB Y15710-PL-915-Proposed Upgrade Project Site Plan – Sheet 1 of 2
- 3.2MB Y15710-PL-916-Proposed Upgrade Project Site Plan – Sheet 2 of 2
- 840.9KB Y15710-PL-917-Proposed Development Site Plan
- 785.6KB Y15710-PL-918-Schematic of Liquid Stream and Sludge Stream
- 4.8MB Y15710-PL-919-Proposed Landscape Plan
- 653.6KB Y15710-PL-920-Odour Control Unit Locations at Existing WWTP
- 1.4MB Y15710-PL-921-Proposed Construction Schedule Overview
- 3.1MB Y15710-PL-922-Proposed Construction Schedule - Sheet 1
- 3.1MB Y15710-PL-923-Proposed Construction Schedule - Sheet 2
- 3.3MB Y15710-PL-924-Proposed Construction Schedule - Sheet 3
- 1.3MB Y15710-PL-925-SBR Retrofit - Existing G.A of SBR Tanks - Plan at 8.00m AMD
- 1.1MB Y15710-PL-926-SBR Retrofit - Existing G.A of SBR Tanks - Plan at 14.60m AMD
- 1.1MB Y15710-PL-927-SBR Retrofit - Existing G.A of SBR Tanks - Plan at 24.30m AMD
- 1.3MB Y15710-PL-928-SBR Retrofit - Existing G.A of SBR Tanks - Sections Sheet 1
- 858.4KB Y15710-PL-929-SBR Retrofit - Existing SBR Tanks Elevations and Sections Sheet 2
- 1.0MB Y15710-PL-930-SBR Retrofit - Existing SBR Tanks – Sections Elevations Sheet 3
- 1.5MB Y15710-PL-931-SBR Retrofit - Proposed GA of SBR Tanks – Plan at 8.00m AMD
- 1.0MB Y15710-PL-932-SBR Retrofit - Proposed GA of SBR Tanks – Plan at 14.60m AMD
- 2.2MB Y15710-PL-933-SBR Retrofit - Proposed GA of SBR Tanks – Plan at 25.00m AMD
- 1.5MB Y15710-PL-934-SBR Retrofit - Proposed Elevations and Sections Sheet 1
- 1.5MB Y15710-PL-935-SBR Retrofit - Proposed Elevations and Sections Sheet 2
- 14.2MB Y15710-PL-936-SBR Retrofit - 3D View of Proposed SBR, Air Blowers and Intermediate Lift PS
- 712.0KB Y15710-PL-937-SBR Retrofit - Existing Intermediate Lift PS - Plans
- 828.4KB Y15710-PL-938-SBR Retrofit - Existing Intermediate Lift PS - Sections
- 742.0KB Y15710-PL-939-SBR Retrofit - Proposed Intermediate Lift PS - Plan
- 831.4KB Y15710-PL-940-SBR Retrofit - Proposed Intermediate Lift PS – Sections
- 781.3KB Y15710-PL-941-Proposed Capacity Upgrade Expansion – Plan at 4.40m AMD and Section 1
- 997.1KB Y15710-PL-942-Proposed Capacity Upgrade Expansion – Plan at 12.40m AMD and Section 2
- 867.7KB Y15710-PL-943-Proposed Capacity Upgrade Expansion – Plan at 24.40m AMD
- 1.3MB Y15710-PL-944-Proposed Capacity Upgrade Expansion – Elevations
- 7.2MB Y15710-PL-945-Proposed Capacity Upgrade Expansion – 3D View
- 2.2MB Y15710-PL-946-Proposed Capacity Upgrade Expansion - Expansion Lift Pump Station – Plan View
- 951.0KB Y15710-PL-947-Proposed Capacity Upgrade Expansion - Expansion Lift Pump Station – Cross Sections
- 273.0KB Y15710-PL-948-Proposed Capacity Upgrade Expansion - Expansion Lift Pump Station – Long Section
- 373.4KB Y15710-PL-949-Proposed Capacity Upgrade Expansion - Expansion Lift Pump Station - Elevations
- 930.2KB Y15710-PL-950-Proposed Diesel Bund Genset & Transformer Area
- 600.2KB Y15710-PL-951-P-Fixation Plant – Site Location Plan
- 727.7KB Y15710-PL-952-P-Fixation Plant – Plan and Section
- 572.1KB Y15710-PL-953-P-Fixation Plant – Elevations
- 385.9KB Y15710-PL-954-Sludge Digester – Plan, Elevation and Section
- 1.5MB Y15710-PL-955-Pasteurisation Plant Building – Plan, Elevation and Section
- 1.1MB Y15710-PL-956-Biogas Storage and Flare - Plan and Elevation
- 1.7MB Y15710-PL-957-Effluent Fine Screens and Bypass Culvert – Indicative Plan and Location
- 2.0MB Y15710-PL-958-Effluent Fine Screens – Indicative Plan and Sections
- 1.1MB Y15710-PL-959-UV Treatment Unit
- 6.1MB Y15710-PL-960-Compound Site Locations
- 642.5KB Y15710-PL-961-Compound Site C1 - Layout
- 587.4KB Y15710-PL-962-Compound Site C2 - Layout
- 600.3KB Y15710-PL-963-Compound Site C3 - Layout
- 632.4KB Y15710-PL-964-Compound Site C2 - Entrance Sightlines and Autotrack Analysis
- 573.9KB Y15710-PL-965-Compound Sites Fencing and Gate Details
- 644.0KB Y15710-PL-966-New Construction Access – Site Location and Layout
- 489.4KB Y15710-PL-967-New Construction Access – Site Layout - Sheet 1 of 2
- 478.8KB Y15710-PL-968-New Construction Access – Site Layout - Sheet 2 of 2
- 695.8KB Y15710-PL-969-New Construction Access – Signage and Sightlines Junction Visibility Splay – Layout Plan
- 430.9KB Y15710-PL-970-New Construction Access – Junction Visibility Sections
- 495.1KB Y15710-PL-971-New Construction Access – Junction Autotrack Analysis
- 526.0KB Y15710-PL-972-New Construction Access – ESB HV and Gas Services in Vicinity of Works
- 631.2KB Y15710-PL-973-New Construction Access – Proposed Site Boundary Fenceline
- 1.1MB Y15710-PL-974-New Construction Access – Proposed Site Haul Road – Plan & Profile
- 739.4KB Y15710-PL-975-New Construction Access – Proposed Site Access Road – Plan & Profile
- 940.2KB Y15710-PL-976-New Construction Access – Proposed Haul Road - Sections
- 715.0KB Y15710-PL-977-New Construction Access – Proposed Site Access Road - Sections
- 3.0MB EIAR Volume 5 Part B Table of Contents
- 8.3MB Y17702-PL-001-General Site Location Plan
- 1.0MB Y17702-PL-002 -Site Location Map
- 697.4KB Y17702-PL-003 -Existing Site Layout
- 6.3MB Y17702-PL-004 -Proposed Site Layout
- 1.9MB Y17702-PL-005 -Existing Buildings to be Demolished (Elevations & Plan)
- 677.8KB Y17702-PL-006-Proposed Ancillary Buildings - Elevations, Plans & Typical Cross Sections
- 590.5KB Y17702-PL-007-Storage Building A - Roof Plan & Elevations
- 1.1MB Y17702-PL-008 - Storage Building A – Plans, Elevations & Cross Sections
- 586.1KB Y17702-PL-009-Storage Building B - Roof Plan & Elevations
- 1.1MB Y17702-PL-010-Storage Building B – Plans, Elevations & Cross Sections
- 7.1MB Y17702-PL-011 -Landscape Layout
- 4.1MB Y17702-PL-012 - Contiguous Elevations
- 5.0MB Y17702-PL-013 - Proposed Road Layout & Markings
- 3.4MB Y17702-PL-014 - Junction Layout, Lamp Standard & Typical Road Details
- 9.8MB Y17702-PL-015 -Surface Water Drainage Layout
- 1.6MB Y17702-PL-016 - Surface Water Drainage Typical Details
- 5.1MB Y17702-PL-017 - Foul Drainage Layout
- 616.1KB Y17702-PL-018 - Foul Pumping Station - Plan & Section
- 2.6MB Y17702-PL-019 - Manhole, Trench Backfill and Bedding Typical Details
- 9.1MB Y17702-PL-020 - Watermain Layout
- 5.5MB Y17702-PL-021 - Watermain Typical Details
- 819.4KB Y17702-PL-022 - Odour Control Unit Plan and Elevation
- 5.1MB Y17702-PL-023 - Electricity & External Lighting Layout
- 820.3KB Y17702-PL-024 - Site Development Details
- 548.8KB Y17702-PL-025 - Weighbridge Details and M&E Control Room Plan & Sections
- 633.7KB Y17702-PL-026 - Construction and Permanent Information Sign
- 5.3MB Y17702-PL-027 - Proposed Site Layout Overlaid with Services